It can achieve AI upgrades based on the SSC (SHANTUI Smart Construction) technology platform, integrating AI and big data-related technologies to establish a fully intelligent closed-loop system of "perception-decision-execution." This enables working condition assessment, dynamic path optimization, and centimeter-level precision control of the blade. As a technological innovation, it leads the leap toward intelligent construction machinery, serving as a model for the industry's transition from "mechanical operation" to "intelligent decision-making.".
| Parameter | DH16-M XL |
|---|---|
| Overall weight(kg) | 17665 |
| Engine brand | FIAT |
| Rated power/rated speed(kW/rpm) | 151/2100 |
| Machine external dimensions(mm) | 5800x3300x3180 |
| Track center distance(mm) | 2040 |
| Track shoe width(mm) | 560/610 |
| Ground contact length(mm) | 3075 |
| Fuel tank capacity(L) | 389 |
| Blade type | PAT |
| Blade capacity(m³) | 3.5 |
| Emissions (Indicated as per international standards) | Eu stageV/T4F |

| SSC Function Details | Sub-function | Ready | Std | Pro | Max | Ultra |
| Intelligent Interaction System (IIS) | Knowledge Base Q&A | ○ | ● | ● | ● | |
| Voice Control | ○ | ● | ● | ● | ||
| Equipment Health Management (EHM) | Vehicle Status Monitoring | ● | ● | ● | ● | ● |
| Fault Alarms | ● | ● | ● | ● | ● | |
| Intelligent Equipment Maintenance (IEM) | Maintenance Reminder | ● | ● | ● | ||
| Operation & Maintenance Manual/Spare Parts Catalog Query | ● | ● | ● | |||
| Power Management System(PMS) | Operation Mode Switching | ● | ● | ● | ● | ● |
| Assisted Operation System (AOS) | Gear Presetting | ● | ● | ● | ● | |
| Automatic Blade Lifting When Reversing | ● | ● | ● | ● | ||
| 5G Long-Range Remote Control | ● | ● | ||||
| Construction Safety System (CSS) | Collision Warning | ● | ● | |||
| Edge Warning | ● | |||||
| Anti-Rollover Warning | ● | ● | ||||
| 360° Intelligent Perception | ○ | ● | ● | ● | ||
| Automated Construction System (ACS) | Implement Guidance | ○ | ● | ● | ● | ● |
| Automatic Implement Control | ○ | ● | ● | ● | ● | |
| Automated Utility Construction System (AUCS) | Path Planning | ● | ||||
| Motion Control | ● | |||||
| Longitudinal Operation Active Judgment | ● | |||||
| Coordinated Construction System (CCS) | Single Machine Construction Data Upload | ● | ● | ● | ● |